Solaklar Power Plant
Client : Ortadogu Enerji San. ve Tic. A.Ş.
Installed Power : 6,9 MW
Commissioning Date : Mart 2012

The Work Done

The work done:

Gas engine assembly

Gas engine jacket water chiller design, manufacturing and installation

Gas engine oil line design, manufacturing and installation

Gas engine exhaust flue line design, manufacturing and installation

Gas line piping design, manufacturing and installation

Cooling water system design, manufacturing and installation

Clean and dirty oil tank design, manufacturing design and installation